Project

SSH Adaptations

at Project West Street

    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image
    Gallery Image

    Key Stakeholders

    Hampshire County Council logoReside with Progress logo

    Summary

    The development comprises a newly built 4-storey detached property comprising nine residential units with 5 x 1-bed apartments, 3 x 2-bed duplexes,1 x 1-bed duplex plus Staff Hub and sleep-in accommodation. The accommodation is all accessed from the rear of the site. The ground and first-floor flats comprise single-bedroom units, with the second-floor flats comprising two-bedroom maisonettes set across the second and third floors. This project was completed in partnership with Hampshire County Council and Progress Housing Group.

    By focusing on accessibility, safety and comfort along with integrating support staff accommodation, this newly built development was successfully adapted to meet the specific needs of people with learning disabilities and mental health issues so that they can live fulfilled lives.

    Video

    The works included

    /icons/tick.png
    Alteration and Refurbishment of a newly built property to provide Specialised Supported Housing in the Hampshire area
    /icons/tick.png
    Conversion of one unit to staff accommodation
    /icons/tick.png
    Kitchen alternations
    /icons/tick.png
    Supply & installation of wireless LD1 Fire Alarm System according to Fire Strategy
    /icons/tick.png
    Supply of Smoke Resistance Intermittent Strips to all bedroom doors to all existing FD30 min Fire Doors
    /icons/tick.png
    Split existing solar array to feed each flat
    /icons/tick.png
    Supply & installation of an EV charger point in between the disabled and car parking space
    /icons/tick.png
    Painting and decorations throughout the property as required for flats and common areas
    /icons/tick.png
    Remove existing taps and replace them with bath mixer taps with hose and handrail fitted to the wall
    /icons/tick.png
    Construct a new shower room with a new door opening, lining door, M&E and floor coverings
    /icons/tick.png
    Supply and installation of Washer and Dryers to all flats
    /icons/tick.png
    Installation of Smoke/Fire seals & locks to all utility & storage cupboards and internal doors to all flats
    /icons/tick.png
    Change all Pendants & Batten Holders to all flats with Flush LED fittings
    /icons/tick.png
    Installation of nonslip slip flooring to all kitchens, bathrooms & en-suite floors
    /icons/tick.png
    Refit & clean all carpets as required and sparkle clean all flats & common areas