    Summary

    Project Knights was delivered for Kent County Council to provide Specialised Supported Housing for 3 adults with Learning Disabilities and Autism. The development ensured the future needs of the residents were met and provided a safe environment for vulnerable individuals who had high levels of support. Kent County Council commissioned this scheme to convert the property to create a bespoke shared living environment where residents can get an opportunity to develop their independence.

    Video

    The works included

    /icons/tick.png
    Reconfiguration of the floor plans to provide ensuite accommodation.
    /icons/tick.png
    Provided Kitchen refurbishment with new appliances installed and new floor coverings.
    /icons/tick.png
    Heating upgrade with new boiler and pressurised cylinder to improve the energy efficiency of the building and provided tamper-proof radiators.
    /icons/tick.png
    Installed heavy-duty sheet vinyl flooring in rooms. Wipeable walls and flooring finishes ensured hygienic and robust living spaces that are easy to clean and maintain.
    /icons/tick.png
    Provided a new external 1100mm high brick boundary wall which was 215mm thick with English bond concrete coping twice weathered.
    /icons/tick.png
    Installed L1 fire alarm system with heat/smoke/carbon monoxide detection and emergency signage as per 'Fire Safety Strategy'.
    /icons/tick.png
    Provided Electrical rewire and insulation upgrades to improve the building’s energy performance rating and to comply with the electrical installation regulations.
    /icons/tick.png
    Off-site disposal of waste material and making good was included for all demolition, alteration and removal items including extending structure and finishing when necessary.
    /icons/tick.png
    Improved EPC rating from D to C to decrease the long-term maintenance costs and lower the carbon footprint of the building.