    Key Stakeholders

    Autism Hampshire logoInclusion Housing logo

    Summary

    Project Ford involved the alteration and refurbishment of an old property which was formally used as supported living for 5 adults into Specialised Supported Houses with staff accommodation for people with learning disabilities and/or autism comprising 1 self-contained accommodation and 2 studios. This property was being re-purposed for Autism Hampshire.

    Video

    The works included

    /icons/tick.png
    Alteration and Refurbishment of an existing property to provide a comfortable, calm, modern independent living internal and external environment.
    /icons/tick.png
    Reconfigured the dining room into a support staff room and kitchen into a visitor’s room & utility room.
    /icons/tick.png
    A New Kitchen was installed with new appliances and provided bathroom upgrades, floor coverings, and decoration throughout the property.
    /icons/tick.png
    Upgraded fire resistance and fire doors, new fire detection and alarm installation to comply with the fire regulations and provide a safe living environment for the residents and support workers.
    /icons/tick.png
    A new door control entry system was installed connected to the fire alarm to ensure the safety and security of the resident and facilitate the support worker’s role.
    /icons/tick.png
    Electrical rewiring and insulation upgrades to improve the building’s energy performance rating and comply with the electrical installation regulations.
    /icons/tick.png
    Full decoration works to give a new and fresh look to the property including all ceilings, walls & woodwork, installed all new flooring, built new walls to include all soundproofing insulation to form ensuite bathroom, living space & bedroom.
    /icons/tick.png
    Installed Moisture-resistant plasterboards to form a new ensuite shower room and upgraded M&E Installations where required.